PE Stamping · Plan Review · AHJ Support · NFPA

Plans Submitted. Stamp Approved.

Jason Kahan, PE brings 30+ years of principal-level fire protection review — no associates, no handoffs. Submit your plans and get a stamped set back in 5–10 days.

What We Do

Document Stamping & Plan Review.

Principal-level PE review on every submittal — fire protection, MEP, and AHJ coordination delivered in 5–10 days.

01

Fire Sprinkler Design

Hydraulic calculations, design drawings, and specifications for wet, dry, preaction, and deluge systems. NFPA 13, 13R, and 13D compliant for all occupancy types.

NFPA 13 NFPA 13R NFPA 13D Hydraulic Calcs Shop Drawing Review
02

Fire Alarm Design

Complete fire alarm system design including device placement, circuit design, battery and load calculations, riser diagrams, and panel schedules per NFPA 72.

NFPA 72 Riser Diagrams Battery Calcs Mass CMR
03

MEP Engineering

Mechanical, electrical, and plumbing system design coordinated with architectural and structural disciplines. From HVAC load calculations to lighting layouts and plumbing risers.

HVAC Electrical Plumbing Energy Code
04

Plan Review & AHJ Support

PE-stamped review of contractor-submitted shop drawings, hydraulic calcs, and fire protection submittals — with AHJ coordination to get your project through without a rejection.

PE Stamp Shop Drawing Review AHJ Coordination 5–10 Day Turnaround